At present the use of plastic distribution box is have very strict requirements, and the installation process is very complex, in order to guarantee the quality of the use of distribution box, so at the time of use must be strictly in accordance with the installation technology to find the professional personnel to install, together look at the below about the installation technology of the distribution box.
A, construction preparation before distribution box in the construction, the first to examine the distribution box body, in the process of inspection, distribution box should be have a certain mechanical strength, and in the surrounding and the surface should be smooth without obvious scratch, no paint falls off phenomenon, and accessories will be used in the distribution box should be intact, and The arrangement of wires should also be orderly, the link part is also very strong, in the distribution box packaging should be attached to the product certificate.
Ii. The conditions for construction in the construction of distribution box, you first need to plastic with a civil engineering structure when will be installed to keep the position of the distribution box, distribution box and to implement will be installed to use the hob or bolt embedded in advance, in the construction site pops up in wall body structure is horizontal, the surface of the need to install the distribution box should plaster and spray Slurry and paint work, do not wait for installation time to do, can be done in advance.
3. Construction operations to be carried out in time, first choose to install the location of the distribution box should be want to be safe and dry, and choose a few more easy to operate, when installed, can't be directly on the ground installation, the installation of the bottom and the ground distance should keep at a distance of more than one meter and a half, if it is installed in the same building, so The installation height of the same distribution box needs to be kept consistent, and the deviation is generally not more than ten meters. During installation, the position of the distribution box should be found according to the requirements, and then the positioning of the spring wire should be conducted according to the shape size of the distribution box and the basic installation requirements. The essence of the positioning of the spring wire is to find the position of the embedded wood brick or iron, and also to find the position of the metal expansion bolt.
On plastic distribution box construction, must first be straightening Angle point of view, then to measure the position of the good line curf and so on some basic positioning work, HSS sail welding is required, but you need to use the feet to find the point of view, then in the use of welding, the construction process of distribution box is very complex, so need to find the professional and technical personnel to operate And the whole operation process should be strictly orderly.